Jerry and I dragged the two 8D Lifeline AGM batteries over to the basic area where they would be mounted.
After some quick measurements we determined that we needed a 21" x 22" rectangular hole in the floor.
As you can see, Jerry cut out the hole in the 3/4 plywood floor with a Milwaukee Sawzall.
Jerry welded some steel bars across from one floor beam to the other and then added some sidewall steel to finish the box.
The two AGM batteries are inset in the floor now and are secured from damage when driving.
I took lots of pictures because most of the work on this part was done by Jerry...
Click HERE to see a slide show of the photos from this post.